| 1. | Calculating method of fuzzy construction time of lapping network with single number 单代号搭接网络模糊工期的计算方法 |
| 2. | Property is initialized at construction time , but it can be changed thereafter with the 属性在构造时初始化,但它可在以后使用 |
| 3. | For example , the following member declaration creates the component at construction time 例如,以下成员声明在构造时创建组件。 |
| 4. | At construction time , 在构造时, |
| 5. | Be sure as well that the objects are not created at page construction time 方法中创建com组件。还应确保不要在构造页时创建对象。 |
| 6. | Discussion on engineering claims and strategy based on loss incurred by delay of construction time 从工期延误损失谈工程索赔的方法与策略 |
| 7. | At construction time would be visible to other threads without synchronization 在构造时的内容在不同步的情况下,对于其他线程也是可见的。 |
| 8. | Is set at construction time , and its value , if it has not yet been cleared , can be retrieved with 的referent是在构造时设置的,在没有被清除之前,可以用 |
| 9. | 155 we should work according to the overall schedule chart ( the construction time schedule ) of the project 我们应该按照工程项目的总进度表(建设进度表)工作。 |
| 10. | 155 we should work according to the overall schedule chart ( the construction time schedule ) of the project 我们应该按照工程项目的确是的总进度表(建设进度表)工作。 |